How we resolved multi-vendor component complexity inside a compact 15-tonne layout, delivering a true “plug-and-play” asset that significantly
By integrating three 1000 kVA transformers into a single, compact 18-tonne prefabricated structure with a custom-curved architectural roof,
Successfully re-engineered a rigid stationary concept into a fully mobile asset that eliminates grid maintenance downtime, maintaining 100%
100% of parking spaces (109 bays) equipped with dual-purpose charging and heating points.
How we deployed 32 dual charging stations to establish 64 simultaneous Type 2 charging points (up to 22
How we maximised urban grid capacity by fitting two 1250 kVA transformers alongside bulky eco-friendly technology into a
How we re-engineered the internal configuration to integrate space-demanding green technology for 1250 kVA installations, completing development and
How we successfully re-engineered the internal layout to fit larger green equipment and high-power 1250 kVA transformers, achieving
How we engineered a highly cost-efficient concrete enclosure that houses a complex arrangement of both primary and secondary
How we replaced a multi-substation grid setup with just one single, high-capacity 6400 kVA unit, dramatically lowering the
How we successfully scaled an existing enclosure design to house massive 3150 kVA transformers, overcoming first-time manufacturing and
Secured a strategic long-term contract to deliver 100 units annually by developing a completely new design and achieving