Share your details and our team will reach out with the information you need.
HELK & HETR – Reliable Solutions for Metering and Grid Connections HELK and HETR cabinets are engineered for secure electricity metering, circuit protection, and as permanent connection points between the grid and the consumer. Manufactured from galvanized sheet metal with powder-coated surfaces, they offer exceptional durability and resistance to harsh environmental conditions. HELK cabinets feature UV-resistant coating and flexible installation options, including pole-mounted, wall-mounted, or ground-level bases, while HETR provides customizable enclosures with compartments for metering and optional wall brackets.
Both product lines are delivered as ready-to-install, certified solutions, ensuring compliance with international standards and reducing installation time. They are widely used by utility companies, industrial and commercial facilities, residential developments, and electrical wholesalers seeking standardized, reliable systems. Backed by short lead times, strong production capacity, and proven references from major utilities in Scandinavia and Estonia, HELK and HETR guarantee quality, flexibility and long-term performance for diverse grid connection needs.
By combining multiple complex work scopes and a custom modular foundation into a single streamlined execution, we delivered
How we resolved multi-vendor component complexity inside a compact 15-tonne layout, delivering a true “plug-and-play” asset that significantly
By integrating three 1000 kVA transformers into a single, compact 18-tonne prefabricated structure with a custom-curved architectural roof,
Successfully re-engineered a rigid stationary concept into a fully mobile asset that eliminates grid maintenance downtime, maintaining 100%
100% of parking spaces (109 bays) equipped with dual-purpose charging and heating points.
How we deployed 32 dual charging stations to establish 64 simultaneous Type 2 charging points (up to 22
How we maximised urban grid capacity by fitting two 1250 kVA transformers alongside bulky eco-friendly technology into a
How we re-engineered the internal configuration to integrate space-demanding green technology for 1250 kVA installations, completing development and
How we re-engineered internal space to accommodate larger, eco-friendly equipment and completed full Internal Arc type-testing in record