BESS E-House for Stella Futura

How we resolved multi-vendor component complexity inside a compact 15-tonne layout, delivering a true “plug-and-play” asset that significantly reduced on-site commissioning time.
High-Power E-House for Veddesta

By integrating three 1000 kVA transformers into a single, compact 18-tonne prefabricated structure with a custom-curved architectural roof, the solution requires minimal on-site installation work.
Mobile SteelFLEX Station for Ellevio

Successfully re-engineered a rigid stationary concept into a fully mobile asset that eliminates grid maintenance downtime, maintaining 100% of standard structural rigidity under high-stress relocation conditions.
2×1250 kVA SF6-Free Substation for E.ON

How we maximised urban grid capacity by fitting two 1250 kVA transformers alongside bulky eco-friendly technology into a single enclosure, completing development with minimal customer involvement.
1250 kVA SF6-Free Urban Substations

How we re-engineered the internal configuration to integrate space-demanding green technology for 1250 kVA installations, completing development and achieving full IP-class validation in minimum time with minimal customer involvement.
E.ON’s First SF6-Free HEKA M Substations

How we re-engineered internal space to accommodate larger, eco-friendly equipment and completed full Internal Arc type-testing in record time, requiring minimal customer involvement.
E.ON High-Power SF6-Free Concrete Substations

How we successfully re-engineered the internal layout to fit larger green equipment and high-power 1250 kVA transformers, achieving full certification in minimum time with minimal customer involvement.
6400 kVA Substation for Lysekil Solar Park

How we replaced a multi-substation grid setup with just one single, high-capacity 6400 kVA unit, dramatically lowering the client’s total internal grid infrastructure costs.