BESS Station for Stella Futura​

CombiFLEX​

In 2024, Harju Elekter delivered a plug-and-play prefabricated E-house to Stella Futura for a battery energy storagesystem (BESS) project in central Sweden. Our product was used to enable grid-connected ancillary services andstrengthen the stability of the local electrical network.​

The technical solution comprised a fully equipped E-house integrating medium-voltage switchgear, low-voltage switchgear,auxiliary transformer and control cabinets. The prefabricated design allowed for quick on-site installation and seamless connectionto the energy storage system, ensuring reliable operation and minimal downtime.​

An internal challenge in this project was coordinating multiple system interfaces and equipment from different supplierswithin a compact layout. By leveraging our modular design approach and precise factory testing, we ensured fullfunctionality and compatibility before delivery, significantly reducing commissioning time on site.​

Technical specification​

  • Dimensions: 3.1 m x 6.47 m x 3.37 m​
  • Weight: 15 t​
  • Environment class: C4​
  • Protection class: SK3​
  • Fire rating: EI60​